Water Main Replacement

I was the lead project engineer for the design of half a mile of new of ductile-iron pipe water main for the City of Santa Monica. I performed extensive utility research, prepared a construction cost estimate, and designed and drafted the proposed water mains and connection details. The project required effective coordination with the surveying, geotechnical, and traffic engineering sub consultants and regular meetings with the City in order to keep within budget and time constraints.

Main Replacement